In record time, wide-diameter rainwater sewers in Elmshorn near Hamburg, which were subject to heavy use, were rehabilitated with pipe liners made by Brandenburger. The easy handling of the factory-saturated pipe liner, the BLUETEC® UVA light-curing technology and the use of the conveyor belt equipment proved to be a great advantage. Speed and quality of the rehabilitation impressed the client.
![Fig. 1. Brandenburger BLUETEC? Comfort curing equipment](https://inzynieria.com/uploaded/articles/crop_4/1(47).jpg)
TREŚĆ DOSTĘPNA DLA ZALOGOWANYCH
ZAŁÓŻ BEZPŁATNE KONTO I CZYTAJ BEZ OGRANICZEŃ
![](https://konferencje.inzynieria.com/wp-content/uploads/2019/01/logo.png)
Konferencje Inżynieria
WIEDZA. BIZNES. ATRAKCJE
Sprawdź najbliższe wydarzenia
Powiązane
Aby dodać komentarz musisz być zalogowany. Przejdź do formularza logowania/rejestracji.