Short construction times, low construction site logistics, and thin wall thickness because of very high stability characteristics are the outstanding features in the sewer rehabilitation pipe lining procedure using light-curing glass fibre liners.
![Fig. 1. Function test of the lamp train that rolls through the liner at the speed of 30 centimetres per minute to cure it.](https://inzynieria.com/uploaded/articles/crop_4/1(89).jpg)