Conference Programme

9.30 - 11.30 Opening Ceremony

11.30 Opening of Exhibition

13.00 - 14.00 Lunch Break

14.00 - 15.30 Session 1. Costs and Legal Aspects
- Application of Game Theory to Develop the Competition Strategy for Contractor to Bid in Pipelines Construction Market H. C. HSU
- Social Costs and Trenchless Ch. Legaz
- Inefficiency Level, an Adimensional Index in the Indirect Generalized Costs Comparisons R. Chirulli
- The French Way to Upgrade Pipe Installation Project JF. Maregiano

14.00 - 15.30 Session 5A. Development in TT Materials and Testing
- Behavior of over Cutting Area Injected by a Flyash Surface-Active Agent Mixture H. Shimada
- Long Distance MicroTunnelling with Polymer Concrete G. Lang
- Curved Jacking of Centrifugally Cast Grp Pipes U. Wallmann
- Analitical Study on the Ground Movement Caused by Pipe Bursting R. Yamaoka

15.30 - 16.00 Coffee Break

16.00 - 18.00 Session 2A. Underground Mapping, Surveys and Inspections
- Development of Conduit Posi tion Measurement Technology Using a Gyroscope and GPS H. Yamashita
- Cost Benefit Criteria for Georadar Mapping Methods A. Agostini
- Soil Electromagnetic Mapping for Enhanced GPR Utility Location A.M. Thomas
- Guided Waves Inspection of Pipe lines: Experiences of Italian Institute of Welding F. Bresciani
- Measures for Prevention of Road Cave - Ins K. Sakaki

8.30 - 9.10 Welcome Speeches

9.10 - 9.30 Special panel: Mediterranean Market by W.Mazzitti

9.30 - 13.15 Short course: TT for Mediterranean Market

9.30 - 11.00 Session 4. Project Fiancing and TT for Development and network urban services
- Increasing Demand for pipeline rehabilitation in Central Europe A. Wroblevska
- 'Stakeholder engagement to Encourage Research Funding in Trenchless Topics J. Parker
- Increasing Financial Performance of Waste Water Utilities by Cost Efficient R. Stein
- Impact Detection Technology may localize Third Party Damage in Real Time J. Focke

9.30 - 11.00 Session 5C. Development in TT Materials and Testing
- Development of a New High Performance PE Pipe Pressure System from Design Phase to Reality G. Kania
- OneDayDig a New Dig Philosophy E. Cottino
- Rehabilitation of Water Mains, Gas and Oil Pipeline with PE F. Prodi
- The Benefits of Pipeline Innovation A. Marangoni

11.00 - 11.30 Coffee break

11.30 - 13.15 Session 6A. Microtunnelling and Pipe Jacking
- Study on Stability of Sorrounding Soil Using Culvert Pipe Jacking T. Morita
- Characterization of Soil Conditioning for Mechanized Tunnelling L. Borio/D. Peila
- Trenchless Installation of Steel Pipes by Pipe Ramming for the Crossing of the main Runway and the taxiway at the Int. Airport of Capodichino - NA A. Chianese
- Collection and Analysis of Case Studies of Microtunnelling Installations M. Barla
11.30 - 13.15 Session 2B. Underground Mapping, Surveys and Inspections
- Airflow-Push Type Intelligent TV Camera-System for the Pipes with Several Right-Angle bends M. Kuroiwa
- The Orfeus Project G. Manacorda
- The Detector Duo A. Simi
- Applying Ultrasound for In-Line Inspection M. Unterseher
- Continous Monitoring of Railway Tracks under the Impact of Horizontal Boring, Micro Tunnelling or Directional Drilling Works R. Foillard

13.15 - 14.00 Lunch Break

14.00 - 15.45 Session 5B. Development in TT Materials and Testing
- The Structural Design of Large Non Circular GRP Prefabricated Linings J.M. Joussin
- New HDD Material - Strong on Site Coating System M. Nakanishi
- The Problem of Design of Resin Liners A. Kuliczkowski
- Investigation of Lifetime Expectancy of Cured-in Place Pipes P. Lystbaek
- Bucling Experiments on Egg Shaped PE Linings B. Falter

15.45 - 16.00 Free Break

15.30 - 17.30 Session 3B. Rehabilitation of Underground Utilities
- 'The French Recommendation for the Structural Design of Large Sewer Linings O. Thepot
- Northcrest Afton Sewer Rehabilitation Project J.W.Shelton
- Experimental Characterization of Cured in-Place Pipes (CIPP) A. Bruzzone
- Cured-in- Place Pipe Made of a Fiber Glass-Reinforced Linings Ph. Begou
- Structural CIPP Rehabilitation Facilities the Renewal of the Fire G. Camali
- Application of CIPP (Cured in Place Pipe) for Water Pipe Rehabilitation Y.Myong

16.00 - 18.00 Session 7A. Directional Drilling
- Risks during the Pull Back Operation of HDD H.M.G. Kruse
- Modelling of HDD Pipeline Frictional Resistance, and Extruded Microtunnelling Linings for Long Distance "Cable Pipe" Installations A.C.D. Royal
- The Importance of Suspension in Drilling Fluid Design to Maximize Hole Cleaning in a Horizontal Bore G. Matula
- Ticino River Crossing: a Borderline HDD L. Adinolfi
- HDD Helps Protection of Venice from Rising Sea Levels F. Esposto
- Evaluation of an Extensive Measured HDD, 48" Steel Pipeline Crossing H.H.Van Der Werff

8.30 - 9.10 Welcome Speeches

9.10 - 9.30 Special panel: Water Scarsity in Med Basin by Eva Haden

9.30 - 16.00 ICE / Workshop

9.30 - 11.30 Session 8. Condition for Water Networks for Treatment and Discharge
- Method of Construction of Tunneled Outfalls, Advantage Application of Different Tunnel Techniques R. Sistermans
- Promoting Investment and Quality in the Loca Infrastructures in Italy C. Serrao
- Case Study: No Dig: an Indispesable Toolbox in a complex Sewerage Project V. Jensen
- Can Cured.in Place Linings Reduce Infiltrations into Sewers- A. Russell
- Case Study: Watermain Rehabilitation in Eastern Canada J. Lojacono
- A Case Study of Groundwater Pollution by Ammoniacal Nitrogen Contaminant A.Vincenzi

11.30 -11.45 Coffee Break

11.45 - 13.15 Session 6B. Microtunnelling and Pipe Jacking
- Applicability of Microtunnelling Tech. in the Torino Subsoil M. Camusso
- A High Complexity Microtunnel for Crossing Monte Lussari A. Guerini
- Simulation of Pipe Jacking: Computer Models and 1:1 Scale Tests B. Bosseler
- Easypipe: a new Technology to install Pipelines V. Petrucco

12.30 -13.30 Lunch Break

14.00 - 16.00 Session 7B. Directional Drilling
- The HDD Technologies applicated in the Torino Subsoil M. Capaccetta
- HDD Rock Drilling in the Alpine Mountains H.J.Bayer
- Thermoconductivity Effects on Electrical Installations using HDD S.T. Ariaratnam
- Large HDD Projects E. Fengler
- Drill Pipes with High Strenght Grade for HDD: the Forging Frictio Welding M. Samac
- Achieving Success in HDD Large Pipeline Installations by use of New Generation Maxi to Mega Rigs Foster

16.30 Closing Ceremony... See you in Moscow