11.30 - 12.30 Coffee break / Opening of the exhibition

12.30 - 14.00 Speech of the NO-DIG 2008 laureates

14.00 - 15.00 Lunch

15.00 - 18.30 Session 1. New machines, techniques and developments for trenchless applications - HALL A
    Chair:
    Hoelterhof J., German Society for Trenchless Technology (GSTT), Germany
    Khrenov K.E., Mosvodokanal MPUE, Russia

  • Sustainability in Trenchless Construction
    Ariaratnam S.T., Sihabuddinra S. A., Arizona St. University, USA
    D.H. Koo, Project Engineering Consultants, USA
  • Some results of use of untrench technologies for clean soils for pesticides
    Shapar A. G., Yemets M. A, Tyapkin O.A., Skrypnyk
    Institute for Nature Management Problems and Ecology of National Academy of Sciences of Ukraine (INMPE NASA), Ukraine
  • Street works R&D Pinchbeck D., European Gas Research Group (GERG), Belgium
  • Project orfeus - optimised radar to find every utility in the street
    Raclavsky J. Institute of Municipal Water Management, Brno University of Technology, Czech Republic
    Scott H. Osys Technology Ltd, UK
16. 30 - 17.00 Coffee-break
  • Applications of geopolymer materials in rehabilitation of industrial sewers
    Montes C., Allouche E.N., Sterling R., Diaz E.I.
    Trenchless Technology Center, USA
  • Continuous monitoring of railway tracks under the impact of horizontal boring, micro tunnelling or directional drilling works
    Moussard H, SNCF, France
    Butterworth J., Solalarme, France
  • Digisewer technology - the ongoing development of full circumference pipeline inspection
    Kuikka S., Uleksin P. , Priit U., DigiSewer Productions Ltd, Finland
19.00 Opening reception 15.00 - 18.30 Session 2. Trenchless techniques and practices of new installations - HALL B
    Chair:
    Ringers H.," VISSER and SMIT HANAB BV", The Netherlands
    Orlov V., Moscow State Construction University, Russia

  • Multi HDD for Venice mobile dams
    Massella N, Posocco P., Esposto F., Anese s.r.l., Italy
  • Horizontally Directed Drilling
    Zaretzky V.Y.,GUP Mosinzhproekt, Russia
  • Mega drilling in Russia sets a new standard
    Kiesow R., Prime Drilling GmbH, Germany
  • Large rigs, big risks
    Hoondert A. J, Vermeer (EMEA), The Netherlands
16. 30 - 17.00 Coffee-break
  • The dynamics of development and modern condition of Russian market of trenchless underground construction of communications by the technology of the horizontal directed drilling
  • Breydburd A.I., International Association of Experts of the Horizontal Directed Drilling, ŤSIV Intertradeť LTd, Russia
  • Innovation in building and maintenance of main gas pipelines by HDD (Horizontal directional drilling) method, using pipes, which have bending radius - 3 degree
    Seleznev G.A., ŤPodzemburstroyť, Ltd., Russia
  • Modeling the soil pipeline interaction during the pull back operation of horizontal directional drilling
    Teunissen J.A.M., Pruiksma J.P., Kruse H.M.G., GeoDelft, National institute unit geo-engineering, The Netherlands
  • Accuracy of location systems for horizontal directional drilling (HDD) Nagovitsyn A., Russia
19.00 Reception on the occasion of opening


Wednesday 4th June 2008

10.00 - 16.30 Session 3. Micro tunneling - choices and practices - HALL D
    Chair:
    Ariaratnam S.T., Arizona St. University, USA
    Martynyuk O., , Ukrainian Society for Trenchless Technology (USTT), Ukraine
  • Construction of tunnels in Russia - practical application of innovative technologies
    Golota M.B., "Spetsstroy-Engineering" Ltd., Russia
  • New dimensions in guidance and monitoring for pipe jacking and microtunneling
    Trumpi-Althaus S., Jackcontrol AG, Switzerland
    Seilert A., Knaub W., HTW University,VMT GmbH, Germany
  • 3rd generation microtunnelling - innovations and trends
    Suhm W.,Herrenknecht AG, Germany
11.30 - 12.00 Coffee break
  • Direct pipe: latest innovation in pipeline construction - technology and references
    Peters M., Herrenknecht AG, Germany
  • Pipeline renewal - Pipe bursting with
    the Hydroburst and Air Impactor technology
    Metcalf B., Vermeer (EMEA), The Netherlands
  • Microtunneling system MTPC-650 "GRANAT"
    Gilshtein S., Krutov V., Alliance-KR, Russia
  • Boring experience of extended-range municipal tunnels with tunneling machines Herrenknecht and Lovat
    Vyushkov S.I., Sobolev P.V., Geoton, Russia
    Mishin S., Morozov A.M., Spectonnelstroy Ltd., Russia
14.00 - 15.00 Lunch Break
  • Modeling the befaviour of a micro-tunneling due to steering corrections
    Broere W., Dijkstra J., Delft University Of Technology, The Netherlands
  • Elaboration of structural and technological adapting parameters and components of auger machines to the customer's requirements
    Mametyev L., Lyubimov O., Kuzbass State Technical University, Russia
  • Tunnel segments for small diameters. Combisegments - the efficient mould concept.
    Peters M., Herrenknecht AG, Germany
    Fedunets B., Mining University Moscow, Russia
16.30 - 17.00 Coffee-break

10.00 - 16.30 Session 4. Trenchless techniques for repair and renovation - HALL E
    Chair:
    Sterling R., Trenchless Technology Center, USA
    Sinitsyn A., Russian Society for Trenchless Technology (RSTT), Russia
  • Rehabilitation of sewerage networks of large diameter with application of new materials and technologies
    Khrenov K.E., Shtoporov V.N., Dudchenko T.O., Pronin A.A, Mosvodokanal MPUE, Russia
  • Trenchless methods for rehabilitation of water supply pipelines in Moscow
    Alyokhin V.E., Mosvodokanal MPUE, Russia
  • Rehabilitation of siphons in sewer systems using the cipp technology
    Tottrup H., Per Aarsleff A/S, Denmark
  • Semi-structural spray lining: a novel rehabilitation technique for drinking water mains
    Robinson Ia., Tindell I., 3M E.Wood, UK
    Brown D., Yorkshire Water Services, UK
    Stockhill P.l., Laing Utilities Ltd, UK
11.30 - 12.00 Coffee break
  • Expanding the application envelope for medium & large diameter cured-in-place pipe products using fiber-reinforced composite technology
    Zaltsman Eu., Insituform Technologies, Inc., USA
  • Development of rehabilitation technology "Ailiner DP method" for small pipe with several bends
    Koyama K., AIREC Engineering Corporation, Japan
  • Light cured glass fibre reinforced cipp and its environmental benefits
    Persson J. B., BKP-Berolina Polyester GmbH & Co., Germany
  • Operating experience of hydraulic pipebursters for pipelines of large diameters
    Gumen E.S., Baltproject, Russia
14.00 - 15.00 Lunch Break
  • New curing techniques of CIPP in Korea
    Yu M., Jang M., Koo J., University of Seoul, Korea
    Park B., SGT Korea co., Korea
  • Internal Strengthening of Prestressed Concrete Cylinder Pip with Carbon Fiber Reinforced Polymer (CFRP)
    Ehsani M. R., The University of Arizona, USA
    C. E. Pena, QuakeWrap, Inc., USA
  • Experience with close-fit rehabilitation of large diameter drinking water pipelines in The Netherlands subline technology
    Jutte A., van der Meer C., BAM / Nelis Infra bv., The Netherlands
16.30 - 17.00 Coffee-break

17.00 - 18.30 Session 5. Asset management and Life Cycle Analysis - HALL D
    Chair:
    Castle J., International Society for Trenchless Technology (ISTT), UK
    Prodous O.A., Consulting Engineers Ltd, Russia
  • Design of Hampstead avenue interceptor extension in downtown Hartford Connecticut
    Bergeson W., Nasri V., DMJM Harris, USA
    Sullivan J., Metcalf & Eddy, USA
  • Inspection and evaluation of pipe lining materials
    Chusid E., Departement of Environmental & Publick Works Management, USA
  • Priorities for selecting technological equipment and materials for trenchless pipeline rehabilitation in the regions of the Russian Federation
    Prodous O.A., Consulting Engineers Ltd, Russia
17.00 - 18.30 Session 6. RQuality assurance for trenchless techniques in theory and in practice - HALL E
    Chair:
    Fomin K., Per Aarsleff A/S, Denmark
    Hemphill J., North American Society for Trenchless Technology (NASTT), USA
  • For a problem of calculation of vertical ground pressure upon concrete pipes driven by microtunnelling
    Shirokov V.S., Russia
  • Long-term Pipeliner Buckling Tests: What We Can Learn from Data Scatter
    Zhao W., Whittle L. G., Ultraliner Inc., USA
  • Renewal of different functions pipelines by tranchless technology
    Rybakov A.P., Litvinsky V.J., "MGS - trenchless technologies" Ltd., Russia
19.00 Gala dinner and award ceremony


Thursday 5th June 2008

10.00 - 11.30 Session 5. Asset management and Life Cycle Analysis - HALL A
    Chair:
    Castle J., International Society for Trenchless Technology (ISTT), UK
    Primin O.G., MosvodokanalNIIproject PUE, Russia
  • The efficiency of scientific approach in choosing the criteria of pipeline rehabilitation scheduling
    Khramenkov S.V., Mosvodokanal MPUE, Russia
    Primin O.G., MosvodokanalNIIproject PUE, Russia
  • NODIG Technologies - Innovative Solutions for Efficient and Fast Pipe Rehabilitation
    Rabmer-Koller U., Rabmer Holding GmbH, Ukraine
  • Trenchless technologies as the tool guaranteeing sustainable development of urban area in the Czech Republic
    ?rytr P., Czech Technical University, Czech Republic
10.00 - 11.30 Session 7. Utility corridor design construction and maintenance - HALL E
    Chair:
    Hemphill J., North American Society for Trenchless Technology (NASTT), USA
    Grigorashenko V.A., Scientific and Production Company "Kombest" Closed Co., Russia
  • City service tunnel i. A Vodičkova as a complex of trenchless methods on a single project in the center of Prague
    Franczyk K., ŤSubterra A.S.ť, Czech Republic
  • Development of rectangular pipe jacking systems for urban infrastructure utilization
    Morita T., Shimada H., Sasaoka T., Matsui K., Kyushu University, UK
    Matsumoto F., Sakai E., Alpha Civil Engineering Co., Ltd, Japan
    Kondo K., Japan Society for Trenchless Technology (JSTT), Japan
  • Rheological models of drilling muds
    Berov Y., ZAO "Bentoprom Group of Companies", Russia
11.30 - 12.00 Coffee-break

12.00 - 12.30 Closing Ceremony

14.00 - 15.00 Lunch

14.30 Site visits


Friday 6th June 2008

10.00 Site visits